1. <meter id="9kjvd"><td id="9kjvd"></td></meter>

      <thead id="9kjvd"></thead>
        <cite id="9kjvd"><rp id="9kjvd"><form id="9kjvd"></form></rp></cite>
        <p id="9kjvd"></p>
        1. 又粗又大网站,女人天堂av,中文字幕少妇人妻,四季AV一区二区夜夜嗨,黄色V国产,蜜桃av秘?无码一区二区三区,最新亚洲中文字幕在线,成人av中文字幕在线播放
          EN CN

          News center

          Home / News center

          Safe use of roll board machine process


          Update date:2017-11-11 Browse:3124


          1. Preparation before starting

          1. Check whether the parts are abnormal, and the fastening screws (cap) should not be loose. The brake should be normal and reliable.

          2. Adjust the drum distance strictly according to the thickness of the plate and shall not overload the operation. Can not coil pressure beyond the mechanical properties specified range of the workpiece.

          2. Attention matters in the operation of the roll board machine

          1. It is necessary to keep the workpiece stable and the position is positive to drive the operation, and the signal should be clearly specified, and one conductor shall be appointed.

          2. The hand should not be placed on the rolled steel plate, and the sample should not be used for inspection, and the roundness of the sample should be checked after the shutdown.

          3. When rolling to the end of the steel plate, roll the roll to the end of the steel plate to prevent the workpiece from falling down.

          4. When the work is done, it is strictly forbidden to stand on the workpiece and find the positive roundness on the rolled cylinder.

          5. When rolling the workpiece with thicker diameter and larger diameter, it should lower the roller and roll it in a small amount.

          6. When rolling a narrower cylinder, roll the roll in the middle of the roll.

          7. After entering the roll, the workpiece shall prevent the hand and clothing from being sucked into the roll.

          Three, roll board machine stop attention matters

          1. If there is abnormal sound of machine operation, check and adjust repair immediately.

          2. Disconnect the switch and cut off the power.

          3. Place the workpiece in the designated place after shutdown.

          Previous: Introduction and operation of the shears    Next: return

          Contact us

          • Address:Industrial concentration
            zone (renmin road), libao town,
            haian county, jiangsu province
          • MB: 13584710666
          • TEL: 0513-88280988
          • FAX: 0513-88283387
          • E-mail: jslx@jslxzg.com
          主站蜘蛛池模板: 精品国产免费人成在线观看| 欧美成人猛片aaaaaaa| 拳交亚洲人极端| 精品亚洲国产成人| 中文字幕日本最新乱码视频| 亚洲综合黄色| 99麻豆| 色中色成人导航| 欧美一区二区| 亚洲字幕av一区二区三区四区| 黄网站色视频免费观看| 亚洲中文字幕2019| 婷婷在线视频| 久久99精品久久久久久琪琪 | 精品视频99| 一区二区三区四区在线不卡高清| 久久久久成人精品免费播放动漫 | 涩涩AV| 亚洲乱码中文字幕综合| 欧洲无码av| 密臀Av| 亚洲国产精品综合久久20| 色欲av永久无码精品无码蜜桃| 日本一二三区视频在线| 丁香六月婷婷| 一群老熟女69| 精品成人中文无码专区| 午夜福利啪啪片| 成人丝袜激情一区二区| 浮力影院麻豆| 巴中市| 国产午夜大地久久| 老司机aⅴ在线精品导航| 婷婷伊人綜合中文字幕小说| 97人妻白浆| 强行交换配乱婬bd| 亚洲欧美中文字幕日韩一区二区| 欧美人妖性爱| 激情图区| 中文字幕av久久爽Av| 亚洲国产精品无码久久电影|